June 2026
On 15th June 2026 we have carried out measurements of physico-chemical parameters and sampling of the Mura River water for analysis of dissolved metals/metalloids at five sites from Sveti Martin na Muri to Kotoriba.
On 15th June 2026 we have carried out measurements of physico-chemical parameters and sampling of the Mura River water for analysis of dissolved metals/metalloids at five sites from Sveti Martin na Muri to Kotoriba.