Skip to main content

March 2026

In March, measurement of physico-chemical parameters and sampling of the Mura river-water for analysis of dissolved metals/metalloids at five sites, from Sveti Martin na Muri to Kotoriba, was conducted during winter and spring sampling of fishes and invertebrates (9-14 March and 23-26 March 2026).